Period 10/2011 6/2013

Peak load capacity

The Energy Market Authority has confirmed the power plants selected for the peak load capacity arrangement for the period of 1 October 2011 to 30 June 2013.

The total volume of the capacity is 600 megawatts (MW).

​Power plant unit​Maximum power, MW​Fuel​Company
​Vaskiluoto 3​ ​155 ​heavy fuel oil ​PVO-Huippuvoima Oy
​Kristiina 1 ​210 ​heavy fuel oil ​PVO-Lämpövoima Oy
​Inkoo 3 ​​235 ​​coal ​​Fortum Power and Heat Oy

 

Peak load capacity during period 1 October 2011 - 30 June 2013

The costs for the peak load capacity were 32 746 k€ charged from the main grid customers. During the period the electricity consumption was 143 229 268 MWh. The average peak load capacity fee was 0,229 €/MWh.

The peak load capacity was not started.