Period 10/2011 6/2013
Peak load capacity
The Energy Market Authority has confirmed the power plants selected for the peak load capacity arrangement for the period of 1 October 2011 to 30 June 2013.
The total volume of the capacity is 600 megawatts (MW).
Power plant unit | Maximum power, MW | Fuel | Company |
---|---|---|---|
Vaskiluoto 3 | 155 | heavy fuel oil | PVO-Huippuvoima Oy |
Kristiina 1 | 210 | heavy fuel oil | PVO-Lämpövoima Oy |
Inkoo 3 | 235 | coal | Fortum Power and Heat Oy |
Peak load capacity during period 1 October 2011 - 30 June 2013
The costs for the peak load capacity were 32 746 k€ charged from the main grid customers. During the period the electricity consumption was 143 229 268 MWh. The average peak load capacity fee was 0,229 €/MWh.
The peak load capacity was not started.