Two-year period 7/2013 - 6/2015

Peak load capacity

The Energy Market Authority has confirmed the power plants selected for the peak load capacity arrangement for the period of 1 July 2013 to 30 June 2015.

The total volume of the capacity is 365 megawatts (MW).

Power plant unit​Maximum power, MW​Fuel​Company
​​Vaskiluoto 3 ​​155 ​​heavy fuel oil ​​PVO-Huippuvoima Oy
​Kristiina 1 ​210 ​heavy fuel oil ​PVO-Lämpövoima Oy