Two-year period 7/2013 - 6/2015
Peak load capacity
The Energy Market Authority has confirmed the power plants selected for the peak load capacity arrangement for the period of 1 July 2013 to 30 June 2015.
The total volume of the capacity is 365 megawatts (MW).
Power plant unit | Maximum power, MW | Fuel | Company |
---|---|---|---|
Vaskiluoto 3 | 155 | heavy fuel oil | PVO-Huippuvoima Oy |
Kristiina 1 | 210 | heavy fuel oil | PVO-Lämpövoima Oy |