Two-year period 7/2015 - 6/2017
Peak load capacity
The Energy Authority has confirmed the power plants selected for the peak load capacity arrangement for the period of 1 July 2015 to 30 June 2017.
The total volume of the capacity is 299 megawatts (MW).
Power plants for the period 1.7.2015 - 30.6.2017
Power plant unit | Maximum power, MW | Fuel | Company |
---|---|---|---|
Naistenlahti 1 | 129 | natural gas | Tampereen Energiantuotanto Oy, as of 1.1.2016 Tampereen Sähkölaitos Oy |
Haapavesi | 160 | heavy fuel oil | Kanteleen Voima Oy |
Demand response for periods 1.12.2015 - 28.2.2016 and 1.12.2016 - 28.2.2017
Consumption unit | Maximum power, MW | Company |
---|---|---|
Suomenoja heat pump | 10 | Fortum Power and Heat Oy |