Two-year period 7/2017 - 6/2020

Peak load capacity

​The Energy Authority has confirmed the power plants selected for the peak load capacity arrangement for the period of 1 July 2017 to 30 June 2020.

The total volume of the capacity is 729 megawatts (MW).

Power plants for the period 1.7.2017 - 30.6.2020

Power plant unit​Maximum power, MWFuelCompany
​Naantali 1 110 coal Turun Seudun Energiantuotanto Oy
Naistenlahti 1 129 ​natural gas ​Tampereen Sähkölaitos Oy
​Meri-Pori 308​ coal ​Fortum Power and Heat Oy (share)
​Haapavesi 160​ heavy fuel oil ​Kanteleen Voima Oy

 

Demand response for periods 1.12.2017 - 28.2.2018, 1.12.2018 - 28.2.2019 and 
1.12.2019 – 28.2.2020

Consumption unit​Maximum power, MWCompany
​Suomenoja heat pump 10 Fortum Power and Heat Oy
Katri Vala heat pump ​12 ​Helen Oy