Two-year period 7/2017 - 6/2020
Peak load capacity
The Energy Authority has confirmed the power plants selected for the peak load capacity arrangement for the period of 1 July 2017 to 30 June 2020.
The total volume of the capacity is 729 megawatts (MW).
Power plants for the period 1.7.2017 - 30.6.2020
Power plant unit | Maximum power, MW | Fuel | Company |
---|---|---|---|
Naantali 1 | 110 | coal | Turun Seudun Energiantuotanto Oy |
Naistenlahti 1 | 129 | natural gas | Tampereen Sähkölaitos Oy |
Meri-Pori | 308 | coal | Fortum Power and Heat Oy (share) |
Haapavesi | 160 | heavy fuel oil | Kanteleen Voima Oy |
Demand response for periods 1.12.2017 - 28.2.2018, 1.12.2018 - 28.2.2019 and
1.12.2019 – 28.2.2020
Consumption unit | Maximum power, MW | Company |
---|---|---|
Suomenoja heat pump | 10 | Fortum Power and Heat Oy |
Katri Vala heat pump | 12 | Helen Oy |